Damson Parkway Bridge - Car and Distribution Centre

Design and construction of a new distribution centre for Jaguar Land Rover at its Solihull site.

The scheme delivered a 23-acre hard-standing parking area and an enclosed bridge, which spans the public highway, to link the new compound area with the production site. The project also included a number of low visual impact administration buildings. The distribution facility is located on land adjacent to the Solihull manufacturing plant, but separated by the Damson Parkway dual-carriageway. The site is used for storing new vehicles before they are dispatched to the point of sale. Linking the production line with new compound allows the vehicles to be driven from the factory into the distribution centre without leaving the JLR site, which is beneficial as the cars are not registered to enter the highway.

SHARE

Share page via TwitterShare page via FacebookShare page via LinkedInShare page via email